Carnell have been working with CarillionWSP (CWSP) in HA Area 8 since the first MAC contract was awarded to them in 2003. Carnell developed their Infrastructure Services offering working with CWSP in Area 12 - see below.
Download the case study on a Sign Installation scheme Carnell delivered to Area 12: